Period |
Project |
Status |
Funding |
Sep 2011 |
Reviewer for Research Project Proposal “Study of Atmospheric Carbon Dioxide in Mauritius and its effect on the Coastal Sea Water Acidification” |
Completed |
MRC |
Aug 2011 |
Multi-stakeholder consultation under the MID project -Energy Work Group |
Completed |
Ministry of Environment & SD |
May 2011 |
EIA for proposed 10-bed St Patrick’s private hospital at Flic en Flac |
Completed |
LP Health Care Ltd |
Apr 2011 - to-date |
Pilot-Scale Composting Project in some Rural Areas across the Island for 300 Beneficiaries |
Ongoing |
Mission Verte |
Jul 2010 - Ju1 2011 |
Assessing the biodegradability of plastic materials using ASTM 5988-D-03 |
Completed |
BDC plastic industry Ltd |
Nov 2009 - Nov 2012 |
Small Developing Island Renewable Energy Knowledge and Technology Transfer Network (DIREKT) Available at http://www.direkt-project.eu/ |
Ongoing |
ACP-EU |
Aug 2009 |
EIA for proposed 4-Star 150 keys hotel at Bel Ombre |
Completed |
Tucson Ltd |
Apr 2009 – Nov 2010 |
Port Waste Inventory Report, Port Waste Management System and Port Waste Management Plan (based on ISO 14000/EMS) for solid wastes management for the Port Louis Harbour |
Completed |
Ministry of Environment and NDU |
Mar 2009 |
EIA for proposed new transfer station at La Chaumiere |
Completed |
Ministry of Local Government |
Jan 2009 |
EIA for proposed renovation & extension of the Klondike resort hotel at Flic en Flac |
Completed |
Colorado Ltd |
Dec 2008 - Dec 2011 |
Collaborative Curriculum Development on Waste Management in Africa and the Pacific Region (CODWAP) Available at http://acp-edulink.eu/content/codwap-collaborative-curriculum-development-waste-management-africa-and-pacific-region-0 |
Completed |
EU |
Oct 2008 |
PER for proposed modern dairy farm for milk production at Le Val |
Completed |
SKC Dairy Fresh Co Ltd |
Mar 2008 |
Design of Activated Sludge Process for treatment of domestic sewage |
Completed |
Appollo-Bramwell Hospital |
Feb 2008 |
EIA for proposed residential/commercial morcellement at Mahebourg |
Completed |
La Compagnie de Beau Vallon Ltée |
Aug 2007 |
Baseline study, National country profile report on chemical wastes’ Non-Toxic Africa |
Completed |
Swedish Government |
May 2007 |
Environmental Audit Report for Dyehouse located at Le Hochet, Terre Rouge |
Completed |
Richfield Tang Knits Co. Ltd |
Mar 2007 |
PER for Proposed Washing Plant at La Tour Koenig |
Completed |
MKLEN Fashions Ltd |
Dec 2006 |
EIA for Proposed Renovation of the Laguna at Camps de Pecheurs, Grand River South East |
Completed |
Auram Investments Ltd |
Aug 2004 |
EIA for Proposed Integrated Denim Mill at La Tour Koenig for |
Completed |
RS Fashions Ltd |
May 2003 |
PER for Poultry Farm at Bambous (Rearing of Layers for Egg production) |
Completed |
Mr R Havaga |
May 2003 |
PER for Bakery & Pastry at La Caverne |
Completed |
Mr K B Canarapen |
Dec 2002 |
PER for Laundry at Plaine Lauzun Industrial Estate for |
Completed |
MKLEN Fashions Ltd |
2002-2008 |
Cane Resources Network for Southern Africa Available at http://www.carensa.com/ |
Completed |
EU |
Training Programme on Energy Efficiency for the Mauritius Tourism Authority
Waste Characterization and Energy Analysis at the Solid Waste Recycling Limited (SWRL)
Training on Composting at the Standard Chartered Bank (SCB) of Mauritius
Energy Audit & Waste Sampling and Characterization for Biogas to energy production in hotels